Friday, November 15, 2013

Day 68 Tue 12 Nov - Joetsu Car Park Camp to MyokoKogen Car Park Camp

Today dist : 47.6 km        Total : 3324.0 km
Today Temp : 2 -9 C     Drizzling and snowing
Ride time: 4 hr  14 min
Ave speed : 11.2 kmh    Max : 31.0
Ave climb: 2 %  Max: 7 %
Trip alti : 682 m    Max: 649 m
Today spend : 1806 yen      Total : 88023 yen

Another day the sun is missing,but the plus point is it did not rain like the past 2 days and also the chilling wind is not blowing as i rode inland on route 18 on the way to Nagano and Ueda where i will meet up with one of the ABM veteran Chan Chin Fei. I tried calling him twice on his mobile phone and home but quite disappointed as nobody pickup the call.Hopefully he didn't forget i am on the way to his house in Ueda. Today witnessed the 2nd time snowing in Myokokogen with altitude of 650m since Akan Lake in Hokkaido, the temp drops to 2C, sensing it would be snowing heavily later,i decided to another car park camp just a little corner at the entrance of the toilet without blocking anyone that might come to use the toilet.It will be a very very cold night.

Not a good sign up in the mountain















Tunnel maintenance work

MyokoKogen Car Park Camp

MyokoKogen Car Park Camp

MyokoKogen Car Park Camp

The snow continue to fall at night


No comments:

Post a Comment